Lysimeter Station Wagna
Installing lysimeters in summer 2004
 
 
 

Figure 2: Installing shear plate
  • The casing is pressed 2 m into the soil and a working pit is excavated.

• A stainless plate for shearing off soil is put into the pit and it is pressed underneath the casing with the sharpened cutting edge at the head.

Part of the soil has to be refilled at the other side of the vessel so that the vessel does not move backwards when the plate is pressed underneath it.

• As some stones blocked the cutting plate, it was easier to pull the vessel on the plate (using belts), see figure 2.

• The disadvantage of using such a plate is that soil is compensated.
 
     
show previous step show next step
 
 
 
 
 
 