Lysimeter Station Wagna
Installing lysimeters in summer 2004
 
 
 
 

Figure 5: Mobile ring is removed
  • The outer cylinder (to protect the weighing system) is put on top of the foundation.

• The pit is backfilled horizon by horizon and compressed by a rattling device to a level 60 cm below the ground surface.

• A wooden ring to prevent soil from trickling in is mounted.

• The mobile ring (35 cm depth) of the inner cylinder is removed (see figure 5) and the topsoil is backfilled.

Vessels have to be surveyed exactly!
 
     
show previous step show next step
 
 
 
 
 
 
 
last update: April 16, 2006