Lysimeter Station Wagna
Installing a lysimeter in spring 2006
 
 
 
 

Step 6
Figure 7: Backfilled site

 

• Figure 7 shows the backfilled area with the lysimeter and the entrance to the measuring shaft.

• Parts of the weather station (see figure 8 on the right) are mounted.

• Cables from the existing weather station are led to the measuring pit, see also figure 8.


Step 6a
Figure 8: Weather station

 
show previous step show next step
   
 
 
 
 
 
 
last update: July 25, 2006